1
Upload Work Orders
Drop your EVA Production Reports here
or click to browse — multiple PDFs accepted
2
Output Format
3
Generate
Upload at least one PDF to continue
Overall Progress
✓
Results
Preview
Work Orders
Applied Rules
Position Assignment
- T — Top/Head rail: first Width dimension in EVA fabrication row
- B — Bottom/Sill rail: second Width dimension (receives water drainage holes)
- L — Left Jamb / Hinge Stile: determined from "View From Inside" diagram
- R — Right Jamb / Lock Stile: opposite side, carries handle routing
Water Drainage
- Y on B piece of outer frame only — N on all other pieces
Fastener Holes
- Y on T, B, L and R of outer frame — N on all sash pieces
Handle Routing
- R stile of sash → handle type from Technicals table (CASEMENT HANDLE / SLIDING HANDLE)
- L stile of sash → hinge operation (CONCEALED HINGE / 3D HINGE / FRICTION STAY)
- Frame pieces and sash T/B → blank
Components
- Simple units: OUTER_FRAME / SASH_1
- Combination (Top Fixed): OF1 (fixed section) + OF2 (operable section) + SASH_1 / SASH_2
- Sliding with mesh: SASH_1 / SASH_2 / MESH
Reinforcement Pairing
- Matched by dimension from Reinforcement section — thickness from item code suffix: -1.0 / -1.2 / -2.0